A platform for research: civil engineering, architecture and urbanism
Scituate builds wells of non-corrosive materials
Details of constructing gravel-packed well 75 ft deep, using 24-in. Transite screen and well pipe.
Scituate builds wells of non-corrosive materials
Details of constructing gravel-packed well 75 ft deep, using 24-in. Transite screen and well pipe.
Scituate builds wells of non-corrosive materials
Pub Works
Lumbert, W.J. (author)
Public Works ; 76
1945
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Scituate Harbor, Scituate Massachusetts
NTIS | 1971
Scituate Harbor, Scituate Massachusetts
NTIS | 1972
Constructing Scituate reservoir
Engineering Index Backfile | 1922
Providence, R. I. -- Scituate tunnel
Engineering Index Backfile | 1926
|