A platform for research: civil engineering, architecture and urbanism
Ohio pavements widened without forms
Method of widening adopted because of shortage of labor and scarcity of steel forms; basically method consists of trenching to width 6 in. outside of final edge of widened pavement; stepped construction used in placing bituminous concrete. (See also Roads and Streets v 88 n 9 Sept 1945 p 104, 110)
Ohio pavements widened without forms
Method of widening adopted because of shortage of labor and scarcity of steel forms; basically method consists of trenching to width 6 in. outside of final edge of widened pavement; stepped construction used in placing bituminous concrete. (See also Roads and Streets v 88 n 9 Sept 1945 p 104, 110)
Ohio pavements widened without forms
Eng News-Rec
Engineering News-Record ; 134
1945
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Ohio pavements widened without forms
Engineering Index Backfile | 1945
How narrow pavements are widened
Engineering Index Backfile | 1949
|Old pavements embedded in widened highways
Engineering Index Backfile | 1930
Narrow pavements widened with stabilized shoulders
Engineering Index Backfile | 1944
|