A platform for research: civil engineering, architecture and urbanism
Hot-mix placed shoulder width on fills
Methods and equipment used in constructing 8.7-mi of bituminous road between Santa Fe and Las Vegas; soil conditions necessitated widening out asphalt base and surface, extra 8 ft on either side across valley fills, or practically to shoulder lines, as erosion protection, and use of mechanically formed hot mix curbs to prevent surface washing of embankment slopes.
Hot-mix placed shoulder width on fills
Methods and equipment used in constructing 8.7-mi of bituminous road between Santa Fe and Las Vegas; soil conditions necessitated widening out asphalt base and surface, extra 8 ft on either side across valley fills, or practically to shoulder lines, as erosion protection, and use of mechanically formed hot mix curbs to prevent surface washing of embankment slopes.
Hot-mix placed shoulder width on fills
Roads Streets
Roads and Streets ; 87
1944
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Method of predicting settlement of fills placed on muck beds
Engineering Index Backfile | 1936
|Influence of placement method on the cone penetration resistance of hydraulically placed sand fills
Online Contents | 2001
|Influence of placement method on the cone penetration resistance of hydraulically placed sand fills
British Library Online Contents | 2001
|NTIS | 1976
|Engineering Index Backfile | 1941
|