A platform for research: civil engineering, architecture and urbanism
Tough tunneling at Leadville
Difficulties in driving 3-mi Leadville, Colo, drainage tunnel are recounted; numerous fault zones, carrying water under 180-ft head, traversed with extensive use of concrete lining carried along with excavation, concrete bulkheads containing drainage systems, guniting, grouting, and probing ahead with test holes; hot water in grout mix counteracted 37 F temperature groundwater and oats were included to seal off small cracks while grout set.
Tough tunneling at Leadville
Difficulties in driving 3-mi Leadville, Colo, drainage tunnel are recounted; numerous fault zones, carrying water under 180-ft head, traversed with extensive use of concrete lining carried along with excavation, concrete bulkheads containing drainage systems, guniting, grouting, and probing ahead with test holes; hot water in grout mix counteracted 37 F temperature groundwater and oats were included to seal off small cracks while grout set.
Tough tunneling at Leadville
Eng News-Rec
Engineering News-Record ; 134
1945
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1943
Engineering Index Backfile | 1951
Structural geology at Leadville
Engineering Index Backfile | 1907
|Vegetables clean up in Leadville
British Library Online Contents | 2000