A platform for research: civil engineering, architecture and urbanism
Two graving docks at shipyard of Kaiser Co being deepened will have depth at high tide of 37 ft to floor, and will be 100 ft wide by 587 ft long inside gate caisson; cellular steel sheet pile, rock ballasted, cofferdam required at gate end.
Two graving docks at shipyard of Kaiser Co being deepened will have depth at high tide of 37 ft to floor, and will be 100 ft wide by 587 ft long inside gate caisson; cellular steel sheet pile, rock ballasted, cofferdam required at gate end.
Shipyard deepened for repair work
Western Construction News
Barth, J.H. (author)
1945
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
An interesting solution for deepened railroads (V-Polder)
British Library Conference Proceedings | 1994
|Carrier repair site -- Puget sound naval shipyard
Engineering Index Backfile | 1961
|Design of Simple Denil and Deepened Alaska Steeppass Fishways
British Library Conference Proceedings | 1996
|Hydraulic influence of deepened navigation channels on flood defence structures.
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2006
|