A platform for research: civil engineering, architecture and urbanism
Time study suggests ways to save $800 on $5,000 operation
Detailed analysis of concrete hauling and placing operation reveals corrections that could be made.
Time study suggests ways to save $800 on $5,000 operation
Detailed analysis of concrete hauling and placing operation reveals corrections that could be made.
Time study suggests ways to save $800 on $5,000 operation
Construction Methods
Kline, P.H. (author)
Construction Methods ; 27
1945
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Figure Ground Comparisons (1:5,000)
Wiley | 2023
|Engineering Index Backfile | 1942
Cost analysis of $5,000 steel house
Engineering Index Backfile | 1937
|Test of a 5,000 kw. alternator
Engineering Index Backfile | 1905
|Youth forum - Twelve ways to save the industry
Online Contents | 1997