A platform for research: civil engineering, architecture and urbanism
Essential features of design, erection, mechanical operation and control for world's longest construction cableways, used at Norfork Dam for placing 1,500,000 cu yd of concrete; description and diagnosis of cause of major failure of one of cableways is presented.
Essential features of design, erection, mechanical operation and control for world's longest construction cableways, used at Norfork Dam for placing 1,500,000 cu yd of concrete; description and diagnosis of cause of major failure of one of cableways is presented.
Construction cableways on Norfork Dam
Eng News-Rec
Pittman, H.V. (author)
Engineering News-Record ; 135
1945
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Norris Dam Construction Cableways
ASCE | 2021
|ASCE | 2021
|Cableways for Dam construction
Engineering Index Backfile | 1958
|Norris dam construction cableways
Engineering Index Backfile | 1939
|Cableways in engineering construction
Engineering Index Backfile | 1911
|