A platform for research: civil engineering, architecture and urbanism
Number of loose eyebars in pin connected truss bridges of early construction prompted Milwaukee Road to devise method of repair which could be used to restore members to their full carrying capacity; method developed involves use of heating torches and arrangement of plates and rods for upsetting bars; description of method, its application and results which have been obtained through its use.
Number of loose eyebars in pin connected truss bridges of early construction prompted Milwaukee Road to devise method of repair which could be used to restore members to their full carrying capacity; method developed involves use of heating torches and arrangement of plates and rods for upsetting bars; description of method, its application and results which have been obtained through its use.
This road shortens eyebars with heat
Ry Eng Maintenance
Chapman, A.B. (author)
1945
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Ultrasonic phased-array inspection of bridge pins and eyebars
Tema Archive | 2002
|Detection of fatigue cracks in eyebars using time of flight diffraction
Tema Archive | 1996
|Detection of Fatigue Cracks in Eyebars Using Time of Flight Diffraction
British Library Conference Proceedings | 1996
|Temporary bridge shortens Haul
Engineering Index Backfile | 1959