A platform for research: civil engineering, architecture and urbanism
At Fontainebleau, combination of pile bents and 14 barges were used to bridge 480-ft wide gap in 6 days; at Montereau 4 barges, framed in pairs, were placed transverse to flow of stream between pile bents, and bridge completed in 10 days.
At Fontainebleau, combination of pile bents and 14 barges were used to bridge 480-ft wide gap in 6 days; at Montereau 4 barges, framed in pairs, were placed transverse to flow of stream between pile bents, and bridge completed in 10 days.
We bridge river Seine
Eng News-Rec
Hall, W.C. (author)
Engineering News-Record ; 134
1945
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Highway bridge over Seine River at Tancarville, France
Engineering Index Backfile | 1956
Cost account of Seine river bridge, St. Boniface
Engineering Index Backfile | 1909
Reconstruction of Carrousel bridge over Seine River in Paris
Engineering Index Backfile | 1937
|New bridge over Seine River at Saint-Cloud, France
Engineering Index Backfile | 1942
|New Sevres bridge on Seine River, downstream from Paris
Engineering Index Backfile | 1963
|