A platform for research: civil engineering, architecture and urbanism
Design of new reinforced concrete bridge to be constructed as grade separation in Bronx, NY, makes false-work unnecessary; concrete forms may be hung from structural steel frames comprising permanent reinforcement.
Design of new reinforced concrete bridge to be constructed as grade separation in Bronx, NY, makes false-work unnecessary; concrete forms may be hung from structural steel frames comprising permanent reinforcement.
Rigid-frame concrete span requires no falsework
Eng News-Rec
Feld, J. (author)
Engineering News-Record ; 134
1945
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Steel erectors span busy river on limited falsework
Engineering Index Backfile | 1929
Existing girders act as falsework for new truss span
Engineering Index Backfile | 1963
Pressure of concrete upon falsework
Engineering Index Backfile | 1955
|Brick arch of 42-ft. Span built without falsework
Engineering Index Backfile | 1932