A platform for research: civil engineering, architecture and urbanism
L.M.S. Bridge reconstruction
Example of reconstruction, in which electric welding was used with advantage, completed at South Tottenham, on London, Midland and Scottish Railway; viaduct is 3-span, double-track, continuous girder bridge, 190 ft long; stringers and crossgirders were inadequate, so that replacement of whole deck became necessary; work was done without interference with normal traffic in either direction over bridge.
L.M.S. Bridge reconstruction
Example of reconstruction, in which electric welding was used with advantage, completed at South Tottenham, on London, Midland and Scottish Railway; viaduct is 3-span, double-track, continuous girder bridge, 190 ft long; stringers and crossgirders were inadequate, so that replacement of whole deck became necessary; work was done without interference with normal traffic in either direction over bridge.
L.M.S. Bridge reconstruction
Engineer
Engineer ; 155
1933
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1933
Engine sheds for L.M.S. railway
Engineering Index Backfile | 1948
A pictorial record of L.M.S. architecture
UB Braunschweig | 1981
|Carlisle-Kingsmoor widening on L.M.S. railway
Engineering Index Backfile | 1946
L.M.S. -- G. W. R. Cheltenham and Gloucester Track Widening
Engineering Index Backfile | 1946