A platform for research: civil engineering, architecture and urbanism
River diversion at Green Mountain dam
Construction of partly lined, 1500-ft long diversion tunnel around right end of Green Mountain dam on Blue River 18 mi south of Kremmling, Colo, driven through unusual geologic formations of sandstone, shale and porphyry intrusions; methods used in driving and lining tunnel; sinking of gate shaft; handling of concrete.
River diversion at Green Mountain dam
Construction of partly lined, 1500-ft long diversion tunnel around right end of Green Mountain dam on Blue River 18 mi south of Kremmling, Colo, driven through unusual geologic formations of sandstone, shale and porphyry intrusions; methods used in driving and lining tunnel; sinking of gate shaft; handling of concrete.
River diversion at Green Mountain dam
Eng News-Rec
Engineering News-Record ; 125
1940
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Trans-mountain water diversion -- A symposium
Engineering Index Backfile | 1930
Construction of Cobble Mountain diversion tunnel
Engineering Index Backfile | 1933
|