A platform for research: civil engineering, architecture and urbanism
Use of traveler to support forms and provide work platform for erection and stripping on 1/2-mi link in approach system of George Washington Bridge at New York City; load of deck concrete was carried directly to footing by vertical timber supports of heavy traveler frame; cost about $1,000,000.
Use of traveler to support forms and provide work platform for erection and stripping on 1/2-mi link in approach system of George Washington Bridge at New York City; load of deck concrete was carried directly to footing by vertical timber supports of heavy traveler frame; cost about $1,000,000.
Traveler speeds arch viaduct forms
Eng News-Rec
Sheppard, K.A. (author)
Engineering News-Record ; 125
1940
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Form on traveler speeds arch concreting
Engineering Index Backfile | 1948
|Engineering Index Backfile | 1888
Erection traveler for the genesee river viaduct
Engineering Index Backfile | 1908
Custom traveler speeds stripping
Engineering Index Backfile | 1964
Repairing concrete arch viaduct
Engineering Index Backfile | 1940
|