A platform for research: civil engineering, architecture and urbanism
Report on construction of Pennsylvania Turnpike tunnels; drilling and shooting; mucking; types of principal equipment used; lining operations; concreting; silicosis prevention; sand seam treatment.
Report on construction of Pennsylvania Turnpike tunnels; drilling and shooting; mucking; types of principal equipment used; lining operations; concreting; silicosis prevention; sand seam treatment.
Turnpike tunnels holed through
Roads Streets
Gould, W.F. (author)
Roads and Streets ; 83
1940
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Mercury vapor lamps light turnpike tunnels
Engineering Index Backfile | 1941
Mercury vapor lamps light Turnpike tunnels
Engineering Index Backfile | 1941
|Elsevier | 1994
Hottest, wettest tunnel holed through
Engineering Index Backfile | 1955
|Chemical sealing stops leakage in tunnels of Pennsylvania turnpike
Engineering Index Backfile | 1954
|