A platform for research: civil engineering, architecture and urbanism
Initial system will consist of 7.7 route-miles of double-tube subway; divided into two lines; there are two types of tunnel, one of horseshoe section and other of circular section; former is advanced by conventional earth tunneling, while latter requires use of shields of kind standard for subaqueous boring; illustrated description of methods and equipment used in excavation, tunnel driving and concrete lining, etc; estimated cost of project $ 46,000,000.
Initial system will consist of 7.7 route-miles of double-tube subway; divided into two lines; there are two types of tunnel, one of horseshoe section and other of circular section; former is advanced by conventional earth tunneling, while latter requires use of shields of kind standard for subaqueous boring; illustrated description of methods and equipment used in excavation, tunnel driving and concrete lining, etc; estimated cost of project $ 46,000,000.
Chicago builds subway
Compressed Air Mag
Vivian, C.H. (author)
1940
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1924
Engineering Index Backfile | 1939
|Chicago park district builds underground garage
Engineering Index Backfile | 1952
|Chicago builds its first utility gallery
Engineering Index Backfile | 1915
Sacramento avenue subway, Chicago, Ill.
Engineering Index Backfile | 1893