A platform for research: civil engineering, architecture and urbanism
Construction work goes forward in face of difficulties in negotiations for unification of surface, elevated and bus properties; estimated total cost, without equipment, now stands at $46,000,000; details of construction; design followed is that of low level tunnels, with tubes horseshoe shaped or circular; walls are of concrete reinforced with steel.
Construction work goes forward in face of difficulties in negotiations for unification of surface, elevated and bus properties; estimated total cost, without equipment, now stands at $46,000,000; details of construction; design followed is that of low level tunnels, with tubes horseshoe shaped or circular; walls are of concrete reinforced with steel.
Chicago digs subway
Transit J
Fleming, H.E. (author)
Transit Journal ; 83
1939
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1940
|British Library Online Contents | 1997
|British Library Online Contents | 2009
|Sacramento avenue subway, Chicago, Ill.
Engineering Index Backfile | 1893
Shield tunnels for Chicago subway
Engineering Index Backfile | 1942
|