A platform for research: civil engineering, architecture and urbanism
Design and construction of traffic circle on Queen Elizabeth Way at Hamilton, Ont, underpassing single-track railway line that cuts across its diameter; bulk excavation; drainage system; concrete pavement.
Design and construction of traffic circle on Queen Elizabeth Way at Hamilton, Ont, underpassing single-track railway line that cuts across its diameter; bulk excavation; drainage system; concrete pavement.
Design of Stoney Creek Traffic Circle
Roads Bridges
Hutton, F.S. (author)
Roads and Bridges ; 78
1940
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Outlet works, Black Butte dam Stoney creek, California
Engineering Index Backfile | 1960
|Construction of a Berm Breakwater and Revetment-Stoney Creek, Ontario
British Library Conference Proceedings | 1990
|Reinforcement in place of the Stoney Creek arch bridge
Engineering Index Backfile | 1930
|Winter operation of stoney gates
Engineering Index Backfile | 1914
INCREMENTAL LAUNCH: THE STONEY TRAIL BRIDGE
Online Contents | 1998
|