A platform for research: civil engineering, architecture and urbanism
Clearing Kachess reservoir area with C.C.C. Forces
Methods used in clearing timber growth from 900 acres of site of Kachess Reservoir, Yakima Project, Washington; piling and burning of timber; man-days of work and costs.
Clearing Kachess reservoir area with C.C.C. Forces
Methods used in clearing timber growth from 900 acres of site of Kachess Reservoir, Yakima Project, Washington; piling and burning of timber; man-days of work and costs.
Clearing Kachess reservoir area with C.C.C. Forces
Reclamation Era
Taylor, P. (author)
Reclamation Era ; 30
1940
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building large earth dams with C.C.C. labor
Engineering Index Backfile | 1933
Reservoir clearing in Tennessee valley
Engineering Index Backfile | 1946
|Assessment of the Compaction Process (The Compaction Calibration Curve, C.C.C.)
British Library Online Contents | 1993
|Clearing methods used at Allatoona reservoir
Engineering Index Backfile | 1949