A platform for research: civil engineering, architecture and urbanism
Modern 2-story and finished basement office building with 13,000 sq ft of floor space was erected at Ambridge, Pa, in 79 working days; fast erection was made possible largely through use of special cellular steel floor, roof and partition sections, bonded metal paneling for walls and other advanced structural items; details of construction and methods employed.
Modern 2-story and finished basement office building with 13,000 sq ft of floor space was erected at Ambridge, Pa, in 79 working days; fast erection was made possible largely through use of special cellular steel floor, roof and partition sections, bonded metal paneling for walls and other advanced structural items; details of construction and methods employed.
79 working days
Steel
Winslow, H.B. (author)
Steel ; 106
1940
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Working days and climatic conditions
Engineering Index Backfile | 1929
|Working days lost down by a quarter
Emerald Group Publishing | 2007
100,000 cubic yards moved in 64 working days
Engineering Index Backfile | 1931
|Weather conditions, working days, bonus and penalty requirements
Engineering Index Backfile | 1930
|Vertical retorts with life of 3800 working days
Engineering Index Backfile | 1921
|