100,000 cubic yards moved in 64 working days
Excavation for foundation of new laboratory building of Mellon Institute of Industrial Research in Pittsburgh; equipment and performance.
100,000 cubic yards moved in 64 working days
Excavation for foundation of new laboratory building of Mellon Institute of Industrial Research in Pittsburgh; equipment and performance.
100,000 cubic yards moved in 64 working days
Contractors Engrs. Monthly
Von Bernewitz, M.W. (author)
1931
2 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Placing 300,000 cubic yards of concrete
Engineering Index Backfile | 1914
Pour 4000 yards of concrete in 12 days
Engineering Index Backfile | 1928
Sea-going dredge of 1250 cubic yards capacity
Engineering Index Backfile | 1922
|Moving 63,000,000 cubic yards for Welland chip canal
Engineering Index Backfile | 1928
Placing 350,000 cubic yards of concrete in ariel dam
Engineering Index Backfile | 1931
|