A platform for research: civil engineering, architecture and urbanism
Relocating transmission line in flood-control area
In flood control project in Los Angeles County, Calif, dam will back water over original location of 22 in. line No. 120 of Southern California Gas Company; to guarantee uninterrupted gas delivery to consumers, it was necessary to relocate part of line; details of construction job of installing 10,054 ft of line.
Relocating transmission line in flood-control area
In flood control project in Los Angeles County, Calif, dam will back water over original location of 22 in. line No. 120 of Southern California Gas Company; to guarantee uninterrupted gas delivery to consumers, it was necessary to relocate part of line; details of construction job of installing 10,054 ft of line.
Relocating transmission line in flood-control area
Oil Gas J
Donaldson, S.S. (author)
Oil and Gas Journal ; 39
1940
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Relocating a Flood-Affected Community: Good Planning or Good Politics?
Taylor & Francis Verlag | 2014
|British Library Online Contents | 1997
|Online Contents | 1997
|Engineering Index Backfile | 1965
|An on-line program for relocating fire-fighting resources
TIBKAT | 1975
|