A platform for research: civil engineering, architecture and urbanism
All-welded machine shop frame designed for rapid erection
Construction of machine shop building completed by Dravo Corp at Neville Island, Pittsburgh, Pa; roof trusses detailed to facilitate fabrication and erection by welding to such extent, that punched holes and erection bolts in field connections were almost wholly eliminated.
All-welded machine shop frame designed for rapid erection
Construction of machine shop building completed by Dravo Corp at Neville Island, Pittsburgh, Pa; roof trusses detailed to facilitate fabrication and erection by welding to such extent, that punched holes and erection bolts in field connections were almost wholly eliminated.
All-welded machine shop frame designed for rapid erection
Eng News-Rec
Newburn, S.H. (author)
Engineering News-Record ; 124
1940
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Milk plant designed for rapid erection
Engineering Index Backfile | 1946
Welded erection seat eliminates field bolts in welded steel frame
Engineering Index Backfile | 1931
|Current practices in welded piping erection
Engineering Index Backfile | 1949
|Erection of MacNamara head-frame
Engineering Index Backfile | 1913
|