STEEL FRAME ERECTION METHOD
To provide a technique capable of easily securing the erection accuracy of a steel frame column while improving working efficiency in a steel frame erection method for fixing the steel frame column to a foundation.SOLUTION: In a steel frame erection method in which a steel column 11 is fixed to a foundation 1 by executing a concrete placing process for placing concrete in a column base part insertion hole 2 after executing a steel column installation process for installing the steel column 11 in which the column base part 11a is inserted into the column base part insertion hole 2 formed in the foundation 1 in a suspended state suspended by timbering 40, a column-beam frame 50 formed by connecting a plurality of steel columns 11 installed in a suspended state to each other by steel beams 15,21,22 is assembled in a steel column installation process.SELECTED DRAWING: Figure 2
【課題】基礎に鉄骨柱を固定する鉄骨建方工法において、作業効率を向上しながら鉄骨柱の建ち精度を簡単に確保することができる技術を提供する。【解決手段】基礎1に形成された柱脚部挿入穴2に柱脚部11aが挿入された鉄骨柱11を支保工40により宙吊りされた宙吊り状態で設置する鉄骨柱設置工程の実行後に、柱脚部挿入穴2にコンクリートを打設するコンクリート打設工程を実行して、基礎1に鉄骨柱11を固定する鉄骨建方工法であって、鉄骨柱設置工程において、宙吊り状態で設置した複数の鉄骨柱11同士を鉄骨梁15,21,22で連結してなる柱梁架構50を組み立てる。【選択図】図2
STEEL FRAME ERECTION METHOD
To provide a technique capable of easily securing the erection accuracy of a steel frame column while improving working efficiency in a steel frame erection method for fixing the steel frame column to a foundation.SOLUTION: In a steel frame erection method in which a steel column 11 is fixed to a foundation 1 by executing a concrete placing process for placing concrete in a column base part insertion hole 2 after executing a steel column installation process for installing the steel column 11 in which the column base part 11a is inserted into the column base part insertion hole 2 formed in the foundation 1 in a suspended state suspended by timbering 40, a column-beam frame 50 formed by connecting a plurality of steel columns 11 installed in a suspended state to each other by steel beams 15,21,22 is assembled in a steel column installation process.SELECTED DRAWING: Figure 2
【課題】基礎に鉄骨柱を固定する鉄骨建方工法において、作業効率を向上しながら鉄骨柱の建ち精度を簡単に確保することができる技術を提供する。【解決手段】基礎1に形成された柱脚部挿入穴2に柱脚部11aが挿入された鉄骨柱11を支保工40により宙吊りされた宙吊り状態で設置する鉄骨柱設置工程の実行後に、柱脚部挿入穴2にコンクリートを打設するコンクリート打設工程を実行して、基礎1に鉄骨柱11を固定する鉄骨建方工法であって、鉄骨柱設置工程において、宙吊り状態で設置した複数の鉄骨柱11同士を鉄骨梁15,21,22で連結してなる柱梁架構50を組み立てる。【選択図】図2
STEEL FRAME ERECTION METHOD
鉄骨建方工法
YASUHARA YUKIYA (author) / SAGARA TOSHIO (author) / SATO MINORU (author) / SADA HIROFUMI (author) / ISEMOTO RYO (author) / ENDO TOMOAKI (author) / FUJII YOSUKE (author) / SHIIBA CHIAKI (author)
2023-02-14
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Erection of steel frame buildings at Gary, Ind
Engineering Index Backfile | 1910
COLUMN BASE STRUCTURE OF STEEL FRAME COLUMN AND ERECTION METHOD OF STEEL FRAME COLUMN
European Patent Office | 2016
|Derrick travelers adapted to steel-frame building erection
Engineering Index Backfile | 1932
Tower cranes challenge Gy Derricks in steel frame erection
Engineering Index Backfile | 1967