A platform for research: civil engineering, architecture and urbanism
Guntersville, 5th in TVA chain
Short illustrated note on main features of 4000-ft concrete gravity dam and power plant; illustrations of Kaplan driven generators, main switchboard room, control cabinet, pumps and oil room.
Guntersville, 5th in TVA chain
Short illustrated note on main features of 4000-ft concrete gravity dam and power plant; illustrations of Kaplan driven generators, main switchboard room, control cabinet, pumps and oil room.
Guntersville, 5th in TVA chain
Power
Power ; 84
1940
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Backwater protection for Guntersville
Engineering Index Backfile | 1939
New type of aggregate stacker developed at Guntersville Dam
Engineering Index Backfile | 1937
New type of aggregate stacker developed at Guntersville Dam
Engineering Index Backfile | 1937
At TVA's guntersville lock -- Low cement content for mass concrete
Engineering Index Backfile | 1965
|