A platform for research: civil engineering, architecture and urbanism
Construction of 3-in. asphaltic concrete pavements on upstream slope of earthfill dam known as Stough Canyon Debris Dam, near Burbank, Calif, 37 ft high and 255 ft long; lining of 1200-ft of wasteway channel with same material.
Construction of 3-in. asphaltic concrete pavements on upstream slope of earthfill dam known as Stough Canyon Debris Dam, near Burbank, Calif, 37 ft high and 255 ft long; lining of 1200-ft of wasteway channel with same material.
Asphalt facing on Debris dam
Western Construction News
Christison, W.E. (author)
1940
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Asphalt facing for Icelandic dam
Tema Archive | 1978
|Asphalt facing methods for Montgomery dam
Engineering Index Backfile | 1958
|Asphalt mixtures with construction and demolition debris
Online Contents | 2010
|Asphalt facing for Al Sourani Dam in Syria
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2011
|