A platform for research: civil engineering, architecture and urbanism
Shasta dam construction layout
Outline of construction layout for placing 5,700,000 cu yd of concrete on site of dam in northern California; concrete is moved out in two-compartment hopper cars via circular track, whence it can be discharged into 8-cu yd buckets on loading dock under seven radial cableways, reaching out over entire dam and power house area from top of 460-ft steel tower.
Shasta dam construction layout
Outline of construction layout for placing 5,700,000 cu yd of concrete on site of dam in northern California; concrete is moved out in two-compartment hopper cars via circular track, whence it can be discharged into 8-cu yd buckets on loading dock under seven radial cableways, reaching out over entire dam and power house area from top of 460-ft steel tower.
Shasta dam construction layout
Eng News-Rec
Engineering News-Record ; 125
1940
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction features of shasta project
Engineering Index Backfile | 1941
|Construction progress at Shasta dam
Engineering Index Backfile | 1939
Construction features of Shasta Project
Engineering Index Backfile | 1941
|Bearing problems on shasta dam construction
Engineering Index Backfile | 1941
Engineering Index Backfile | 1944
|