A platform for research: civil engineering, architecture and urbanism
Bearing problems on shasta dam construction
42 Fafnir roller bearings used to insure free articulation in vertical and horizontal planes on 7 main cableway connections at tower top; heavy, solid gudgeon pin equipped with 6 bearings of special design used at each cableway connection to give articulated fastening despite heavy loading, and to eliminate any possibility of crystallization.
Bearing problems on shasta dam construction
42 Fafnir roller bearings used to insure free articulation in vertical and horizontal planes on 7 main cableway connections at tower top; heavy, solid gudgeon pin equipped with 6 bearings of special design used at each cableway connection to give articulated fastening despite heavy loading, and to eliminate any possibility of crystallization.
Bearing problems on shasta dam construction
Western Machy Steel World
1941
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Shasta dam construction layout
Engineering Index Backfile | 1940
Construction features of shasta project
Engineering Index Backfile | 1941
|Construction progress at Shasta dam
Engineering Index Backfile | 1939
Construction features of Shasta Project
Engineering Index Backfile | 1941
|Engineering Index Backfile | 1944
|