A platform for research: civil engineering, architecture and urbanism
Foundation exploration at Kentucky dam
Methods used in intensive exploration of site of largest of all Tennessee Valley Authority dams, which will be combination concrete and earth fill structure 8650 ft long and will create reservoir 73 ft above present river level; angle borings; permeability tests in field; overburden drilling; rock drilling.
Foundation exploration at Kentucky dam
Methods used in intensive exploration of site of largest of all Tennessee Valley Authority dams, which will be combination concrete and earth fill structure 8650 ft long and will create reservoir 73 ft above present river level; angle borings; permeability tests in field; overburden drilling; rock drilling.
Foundation exploration at Kentucky dam
Eng News-Rec
Lynn, A.V. (author) / Rhoades, R.F. (author)
Engineering News-Record ; 125
1940
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1959
|TIBKAT | 1959
|Elsevier | 1984
Deep Solution Channel, Kentucky Dam, Kentucky
ASCE | 2021
|