A platform for research: civil engineering, architecture and urbanism
Launched bracing cuts cofferdam costs
Reduction in costs of cofferdam for construction of Cooper River dam near Camden, NJ, by shore built bracing units launched and sunk end to end across river, with single line of sheet piling; structures used and procedure followed in launching and sinking bracing frames for sheet pile cofferdam; dam is concrete structure, 194 ft long and has two vertical lift gates.
Launched bracing cuts cofferdam costs
Reduction in costs of cofferdam for construction of Cooper River dam near Camden, NJ, by shore built bracing units launched and sunk end to end across river, with single line of sheet piling; structures used and procedure followed in launching and sinking bracing frames for sheet pile cofferdam; dam is concrete structure, 194 ft long and has two vertical lift gates.
Launched bracing cuts cofferdam costs
Eng News-Rec
Osler, Jr., J.H. (author)
Engineering News-Record ; 125
1940
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Caisson cofferdam foundation with special bracing
Engineering Index Backfile | 1922
|Jacks lower bracing system as cofferdam is excavated
Engineering Index Backfile | 1965
Heavy bracing gives large open pockets in deep Cofferdam
Engineering Index Backfile | 1917
Light Cofferdam cuts lock cost
Engineering Index Backfile | 1959
Unique two-barge technique expedites placing of Cofferdam bracing for bridge piers
Engineering Index Backfile | 1949
|