A platform for research: civil engineering, architecture and urbanism
Development and construction of longwall roadways
Discussion of advancing longwall roads which are driven through areas from which coal seam has been totally extracted; to construct roadway so that it will remain in state of reasonably good repair without undue maintenance, everything possible must be done to bring overlying strata to state of equilibrium as quickly as possible and avoid future disturbance of equilibrium. (See also - discussion p 664-8; Bul n 343 Nov 1940)
Development and construction of longwall roadways
Discussion of advancing longwall roads which are driven through areas from which coal seam has been totally extracted; to construct roadway so that it will remain in state of reasonably good repair without undue maintenance, everything possible must be done to bring overlying strata to state of equilibrium as quickly as possible and avoid future disturbance of equilibrium. (See also - discussion p 664-8; Bul n 343 Nov 1940)
Development and construction of longwall roadways
Can Inst Min Met -- Trans
Gordon, H.C.M. (author)
1940
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Floor reinforcement in longwall roadways
British Library Conference Proceedings | 1992
|Application of double packing on longwall roadways
Engineering Index Backfile | 1945
|Application of double packing on longwall roadways
Engineering Index Backfile | 1945
|Application of double packing on longwall roadways
Engineering Index Backfile | 1945
|Study of effect of longwall faces on roadways
Engineering Index Backfile | 1964
|