A platform for research: civil engineering, architecture and urbanism
Aqueduct barge fleet -- Canal relined by crews on floating platforms
Use of self-propelled barges in relining of 2-mi section of concrete lined canal, at upper end of Los Angeles Aqueduct in Owens Valley, with 5 in. of concrete.
Aqueduct barge fleet -- Canal relined by crews on floating platforms
Use of self-propelled barges in relining of 2-mi section of concrete lined canal, at upper end of Los Angeles Aqueduct in Owens Valley, with 5 in. of concrete.
Aqueduct barge fleet -- Canal relined by crews on floating platforms
Western Construction News
1940
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1892
Engineering Index Backfile | 1894
Tema Archive | 1992
|Project Feature: Concrete reservoir relined
British Library Online Contents | 1998
Engineering Index Backfile | 1898
|