A platform for research: civil engineering, architecture and urbanism
Simple truss bridge lengthened into long cantilever
Method of lengthening Missouri Pacific RR bridge at Krotz Springs, La, by separating two of existing 300-ft simple truss spans by 720 ft of new steelwork in form of twin cantilevers having common anchor arm, 300-ft spans being hung from ends of new cantilevers; removal of two old piers; construction of two new deep caisson piers of special design. (see also Ry Gaz v 73 n 16 Oct 18 1940 p 407-8)
Simple truss bridge lengthened into long cantilever
Method of lengthening Missouri Pacific RR bridge at Krotz Springs, La, by separating two of existing 300-ft simple truss spans by 720 ft of new steelwork in form of twin cantilevers having common anchor arm, 300-ft spans being hung from ends of new cantilevers; removal of two old piers; construction of two new deep caisson piers of special design. (see also Ry Gaz v 73 n 16 Oct 18 1940 p 407-8)
Simple truss bridge lengthened into long cantilever
Eng News-Rec
Engel, H.J. (author)
1940
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Simple truss bridge lengthened into long Cantilever
Engineering Index Backfile | 1940
|Cantilever erection of Truss bridge
Engineering Index Backfile | 1931
|Steel truss bridge with track cantilever assembly and construction method of steel truss bridge
European Patent Office | 2023
|Temperature-Driven Assessment of a Cantilever Truss Bridge
British Library Conference Proceedings | 2017
|