A platform for research: civil engineering, architecture and urbanism
Hinged forms speed folded-plate roof job
Problem of pouring 36 identical concrete roof segments on one/day schedule in construction of roof for reservoir at Omaha was solved by hinging one leaf of V-sectional plate form which reduces amount of vertical movement necessary to allow form unit to be moved laterally from beneath completed concrete work.
Hinged forms speed folded-plate roof job
Problem of pouring 36 identical concrete roof segments on one/day schedule in construction of roof for reservoir at Omaha was solved by hinging one leaf of V-sectional plate form which reduces amount of vertical movement necessary to allow form unit to be moved laterally from beneath completed concrete work.
Hinged forms speed folded-plate roof job
Construction Methods Equipment
1962
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
FOLDED-PLATE ROOF CONSTRUCTION METHOD AND FOLDED-PLATE ROOF
European Patent Office | 2023
|RENEWAL METHOD OF FOLDED-PLATE ROOF, AND FOLDED-PLATE ROOF
European Patent Office | 2022
|FOLDED PLATE ROOF CONNECTING DEVICE AND FOLDED PLATE ROOF STRUCTURE
European Patent Office | 2018
|DRILL SCREW FOR FOLDED-PLATE ROOF AND FOLDED-PLATE ROOF METHOD
European Patent Office | 2019
|