A platform for research: civil engineering, architecture and urbanism
From rail to trolley coach without interruption
Advance planning and systematized construction kept street car service in Wilmington right up to day of changeover; in about 4 mo, trolley coach service involving 60 units was placed on 23 mi of street; engineering and construction crews had to be trained; storage and service facilities provided; operators taught to drive coaches.
From rail to trolley coach without interruption
Advance planning and systematized construction kept street car service in Wilmington right up to day of changeover; in about 4 mo, trolley coach service involving 60 units was placed on 23 mi of street; engineering and construction crews had to be trained; storage and service facilities provided; operators taught to drive coaches.
From rail to trolley coach without interruption
Transit J
Smith, E.P. (author)
Transit Journal ; 85
1941
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Is trolley coach stealing show
Engineering Index Backfile | 1945
|Economics of Electric Trolley Coach Operation
British Library Online Contents | 1995
|