A platform for research: civil engineering, architecture and urbanism
Construction and operation of single-stage digestion tank
Details of excavation and placing of concrete tank 150 × 100 ft giving total capacity when full, of 186,000 cu ft; operating results tabulated and results of analysis of samples taken between Apr 1 1940 and Aug 1 1941 are given.
Construction and operation of single-stage digestion tank
Details of excavation and placing of concrete tank 150 × 100 ft giving total capacity when full, of 186,000 cu ft; operating results tabulated and results of analysis of samples taken between Apr 1 1940 and Aug 1 1941 are given.
Construction and operation of single-stage digestion tank
Surveyor
Snook, W.F. (author)
Surveyor ; 100
1941
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
|Engineering Index Backfile | 1940
|