A platform for research: civil engineering, architecture and urbanism
Report on reconstruction, by widening existing 18-ft pavement to 40-ft pavement, of section of route U S 29 between Salisbury and China Grove, NC, 6.83 mi long; grading; concrete paving; asphalt paving.
Report on reconstruction, by widening existing 18-ft pavement to 40-ft pavement, of section of route U S 29 between Salisbury and China Grove, NC, 6.83 mi long; grading; concrete paving; asphalt paving.
Four lane road built without detour
Roads Streets
Ehringer, G.H. (author)
Roads and Streets ; 84
1941
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
|Old swing span moved upstream for road detour
Engineering Index Backfile | 1934
Engineering Index Backfile | 1938
|Online Contents | 2016
Down detour road : an architect in search of practice
TIBKAT | 2010
|