A platform for research: civil engineering, architecture and urbanism
Old swing span moved upstream for road detour
Tide utilized to float and reseat 600-ton span, 323 ft long, over Fore River at Quincy, Mass, 380 ft upstream; old steelwork reinforced and braced for moving; temporary pile center pier designed to requirements of permanent structure.
Old swing span moved upstream for road detour
Tide utilized to float and reseat 600-ton span, 323 ft long, over Fore River at Quincy, Mass, 380 ft upstream; old steelwork reinforced and braced for moving; temporary pile center pier designed to requirements of permanent structure.
Old swing span moved upstream for road detour
Eng News-Rec
Engineering News-Record ; 113
1934
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Four lane road built without detour
Engineering Index Backfile | 1941
|Two three-span bridges moved in six hours
Engineering Index Backfile | 1933
|Engineering Index Backfile | 1938
|Swing span bridge converted to fixed span
Engineering Index Backfile | 1953
Swing span bridge converted to fixed span
Engineering Index Backfile | 1953