A platform for research: civil engineering, architecture and urbanism
Concrete and bituminous macadam used on heavily traveled road
Design and construction of short cut highway from Westerly to Providence, RI, on which concrete is used as paving for heavily traveled lanes and bituminous macadam is laid on less used center lanes and on shoulders; removal of old concrete pavement; concrete paving.
Concrete and bituminous macadam used on heavily traveled road
Design and construction of short cut highway from Westerly to Providence, RI, on which concrete is used as paving for heavily traveled lanes and bituminous macadam is laid on less used center lanes and on shoulders; removal of old concrete pavement; concrete paving.
Concrete and bituminous macadam used on heavily traveled road
Eng News-Rec
Engineering News-Record ; 126
1941
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bituminous macadam and bituminous concrete
Engineering Index Backfile | 1913
|Bituminous macadam road construction
Engineering Index Backfile | 1919
|Bituminous macadam road construction
Engineering Index Backfile | 1925
|Bituminous macadam and bituminous concrete pavements
Engineering Index Backfile | 1916
|Bituminous macadam road-building in Oregon
Engineering Index Backfile | 1938
|