A platform for research: civil engineering, architecture and urbanism
Cherokee dam on Holston River
Methods and equipment used in current construction of dam of Tennessee Valley Authority which will consist of concrete gravity spillway section 175 ft high 412 ft long, flanked by gravity non-overflow sections on either side, length 1277 ft, and impervious rolled fill embankments extending for length of 5030 ft, thus making total length of dam about 6750 ft; forms and concrete placing.
Cherokee dam on Holston River
Methods and equipment used in current construction of dam of Tennessee Valley Authority which will consist of concrete gravity spillway section 175 ft high 412 ft long, flanked by gravity non-overflow sections on either side, length 1277 ft, and impervious rolled fill embankments extending for length of 5030 ft, thus making total length of dam about 6750 ft; forms and concrete placing.
Cherokee dam on Holston River
Eng News-Rec
Engineering News-Record ; 126
1941
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Watershed Risk Analysis Model for TVA's Holston River Basin
British Library Conference Proceedings | 1996
|South Holston valve repair challenge
Online Contents | 1994
South Holston Power Intake Penstock Rehabilitation
British Library Conference Proceedings | 1995
|Power facilities at South Holston dam include submerged intake
Engineering Index Backfile | 1952
|