A platform for research: civil engineering, architecture and urbanism
Construction of bridge over Nipisiguit River; existing structure consists of three steel through-truss spans of 150 ft each, center to center, on granite masonry piers with pile foundations; moving methods described; bridge to be built will be about 1200 ft long and of wooden construction due to scarcity of steel for non-war purposes; consists of 6 deck spans with aproaches and will be reinforced with concrete T beam spans, one on each end.
Construction of bridge over Nipisiguit River; existing structure consists of three steel through-truss spans of 150 ft each, center to center, on granite masonry piers with pile foundations; moving methods described; bridge to be built will be about 1200 ft long and of wooden construction due to scarcity of steel for non-war purposes; consists of 6 deck spans with aproaches and will be reinforced with concrete T beam spans, one on each end.
New Brunswick bridge moved 32 feet
Eng Contract Rec
Malloy, R.A. (author)
1941
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hortonsphere erected on timber bed and moved 800 feet
Engineering Index Backfile | 1944
A 7,500-ton office building is moved 85 feet
Engineering Index Backfile | 1923
3500 ton university of Toronto building moved 250 feet
Engineering Index Backfile | 1959
|Complete bridge moved 22 miles
Engineering Index Backfile | 1932
|Abandoned bridge moved to new site
Engineering Index Backfile | 1951
|