A platform for research: civil engineering, architecture and urbanism
Illustrated description of disassembling of steel truss bridge in Wyoming, moving it 30 mi and its re-erection; bridge consists of three 95-ft spans carrying 20-ft concrete roadway slab; three truss spans weight 50 tons each; disassembled truss, cut into two pieces, was loaded on two trailers and hauled by truck.
Illustrated description of disassembling of steel truss bridge in Wyoming, moving it 30 mi and its re-erection; bridge consists of three 95-ft spans carrying 20-ft concrete roadway slab; three truss spans weight 50 tons each; disassembled truss, cut into two pieces, was loaded on two trailers and hauled by truck.
Abandoned bridge moved to new site
Western Construction
Ainsley, W.G. (author)
Western Construction ; 26
1951
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Complete bridge moved 22 miles
Engineering Index Backfile | 1932
|New Brunswick bridge moved 32 feet
Engineering Index Backfile | 1941
|Utilities moved to accommodate new Seine bridge
Online Contents | 1994
|Bridge spans moved to bank for raising
Engineering Index Backfile | 1945
|Heavy steel bridge moved without stopping traffic
Engineering Index Backfile | 1926
|