A platform for research: civil engineering, architecture and urbanism
Twin cantilevers erected by balancing
Methods and equipment used in erection without use of falsework bents, of combined steel truss bridge across Mississippi River at Baton Rouge, La, consisting of 5 spans 490 ft to 848 ft in length; special precautions taken; stages in balanced cantilever erection scheme.
Twin cantilevers erected by balancing
Methods and equipment used in erection without use of falsework bents, of combined steel truss bridge across Mississippi River at Baton Rouge, La, consisting of 5 spans 490 ft to 848 ft in length; special precautions taken; stages in balanced cantilever erection scheme.
Twin cantilevers erected by balancing
Eng News-Rec
Durkee, E.L. (author) / Kirkley, L.F. (author)
Engineering News-Record ; 126
1941
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concept of twin cantilevers in analysis of shear-walled multi-storey buildings
Engineering Index Backfile | 1966
|DataCite | 2024
|Engineering Index Backfile | 1936
|Engineering Index Backfile | 1962
|