A platform for research: civil engineering, architecture and urbanism
Design and construction of highway bridge over Meramec River near St. Louis, having main span of 264 ft and side spans of 192 ft; stress analysis by method of least work, coupled with determination of influence lines by method of elastic weights; rolled H-sections used for tie member as well as for all other truss members except top chord, which is built-up section; cast steel bearings; floor system; superstructure erection.
Design and construction of highway bridge over Meramec River near St. Louis, having main span of 264 ft and side spans of 192 ft; stress analysis by method of least work, coupled with determination of influence lines by method of elastic weights; rolled H-sections used for tie member as well as for all other truss members except top chord, which is built-up section; cast steel bearings; floor system; superstructure erection.
Continuous tied arch built in Missouri
Eng News-Rec
Mullins, H.H. (author)
Engineering News-Record ; 126
1941
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tied-arch bridge arch rib support and tied-arch bridge arch rib installation method
European Patent Office | 2023
|Installation and construction method for tied arch continuous beam composite arch
European Patent Office | 2024
|Chicago's First Tied-Arch Bridge
British Library Online Contents | 2014
|Chicago’s First Tied-Arch Bridge
ASCE | 2013
|Installation construction method for tied-arch bridge arch rib
European Patent Office | 2020
|