A platform for research: civil engineering, architecture and urbanism
Rainbow bridge has 950-ft steel arch erected without falsework
Notes on construction of bridge across Niagara River and gorge, costing $3,760,000; system of wire rope cables.
Rainbow bridge has 950-ft steel arch erected without falsework
Notes on construction of bridge across Niagara River and gorge, costing $3,760,000; system of wire rope cables.
Rainbow bridge has 950-ft steel arch erected without falsework
Eng Contract Rec
1941
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Four miles of bridge spans erected without falsework
Engineering Index Backfile | 1951
Long steel arches erected by falsework elevator
Engineering Index Backfile | 1936
Reinforced concrete truss bridges erected without falsework
Engineering Index Backfile | 1920
Long steel arches erected by falsework elevator
Engineering Index Backfile | 1936
Steel falsework supports forms for multiple-arch bridge
Engineering Index Backfile | 1934