A platform for research: civil engineering, architecture and urbanism
Grading and paving at U.S. national airport
Design of 720 acre airport and drainage problems presented; total of over 21,000,000 cu yd of earthwork handled in grading; stabilization of sub-base discussed and types of equipment and operations required to stabilize sub-base.
Grading and paving at U.S. national airport
Design of 720 acre airport and drainage problems presented; total of over 21,000,000 cu yd of earthwork handled in grading; stabilization of sub-base discussed and types of equipment and operations required to stabilize sub-base.
Grading and paving at U.S. national airport
Roads Bridges
Roads and Bridges ; 79
1941
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Draining, grading and paving the Detroit city airport
Engineering Index Backfile | 1930
|Draining, grading and paving the Detroit city airport
Engineering Index Backfile | 1930
|Online Contents | 1997
|Engineering Index Backfile | 1929
|Rigid and stiff airport paving
Engineering Index Backfile | 1964
|