A platform for research: civil engineering, architecture and urbanism
"Blackout" bomber plants in south
New type of shatter-proof, non-combustible side wall and roof construction combining three types of glass fiber and prefabricated steel panels is being used to insure insulation and acoustical control for working efficiency in twin 4000-ft long Army bomber assembly plants being erected at Fort Worth, Texas and Tulsa, Okla. (See also Mfrs Rec v 110 n 10 Oct 1941 p 33, 72 and 75)
"Blackout" bomber plants in south
New type of shatter-proof, non-combustible side wall and roof construction combining three types of glass fiber and prefabricated steel panels is being used to insure insulation and acoustical control for working efficiency in twin 4000-ft long Army bomber assembly plants being erected at Fort Worth, Texas and Tulsa, Okla. (See also Mfrs Rec v 110 n 10 Oct 1941 p 33, 72 and 75)
"Blackout" bomber plants in south
Construction Methods
Construction Methods ; 23
1941
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Kommentar - Brownout — Blackout
Online Contents | 2011
|More power for bomber production
Engineering Index Backfile | 1942