A platform for research: civil engineering, architecture and urbanism
More power for bomber production
Description of Glenville Dam being built by Aluminum Co of America to provide added power for aluminum production; dam is of rock and earth fill type, 900 ft long, has max height of 150 ft and contains net volume of 1,060,000 cu yd; spillway of new design is described.
More power for bomber production
Description of Glenville Dam being built by Aluminum Co of America to provide added power for aluminum production; dam is of rock and earth fill type, 900 ft long, has max height of 150 ft and contains net volume of 1,060,000 cu yd; spillway of new design is described.
More power for bomber production
Eng News-Rec
Engineering News-Record ; 128
1942
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
"Blackout" bomber plants in south
Engineering Index Backfile | 1941
Competitions & wins Lincoln Bomber Command memorial
British Library Online Contents | 2013
Competitions & wins - Lincoln Bomber Command memorial
Online Contents | 2013
Engineering Index Backfile | 1955
|Winter construction methods followed at bomber base
Engineering Index Backfile | 1943