A platform for research: civil engineering, architecture and urbanism
Features of hydroelectric and navigation development which will ultimately produce 1,000,000 hp.; curved reinforced-concrete dam 38 m. high, 766 m. long.
Features of hydroelectric and navigation development which will ultimately produce 1,000,000 hp.; curved reinforced-concrete dam 38 m. high, 766 m. long.
Dnieper Hydroelectric Plant
Das Grosskraftwerk am Dniepr
Krueger, W. (author)
1930
2 pages
1 Fig.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
The Dnieper river hydroelectric power station sequence
Springer Verlag | 1967
|The Dnieper river hydroelectric power station sequence
Online Contents | 1967
|Cavitation erosion of turbines in the lower Dnieper hydroelectric station
Springer Verlag | 1969
|Fortieth anniversary of the V. I. Lenin Dnieper hydroelectric station
Online Contents | 1972
Cavitation erosion of turbines in the lower Dnieper hydroelectric station
Online Contents | 1969
|