A platform for research: civil engineering, architecture and urbanism
Construction of Kembs Hydroelectric Power Plant on Rhine
Reinforced concrete Stoney gate dam 11.5 m. high and about 170 m. long, power canal 5.5 km. long and power house sheltering six 33,500-hp. turbines; excavation and groundwater control; operation of construction railroad; layout of concreting plant and methods of depositing concrete. (See also - nos. 15 Oct. 11, 1930, pp. 177-180, no 16 Oct. 18, pp. 189-192)
Construction of Kembs Hydroelectric Power Plant on Rhine
Reinforced concrete Stoney gate dam 11.5 m. high and about 170 m. long, power canal 5.5 km. long and power house sheltering six 33,500-hp. turbines; excavation and groundwater control; operation of construction railroad; layout of concreting plant and methods of depositing concrete. (See also - nos. 15 Oct. 11, 1930, pp. 177-180, no 16 Oct. 18, pp. 189-192)
Construction of Kembs Hydroelectric Power Plant on Rhine
Vom Bau des Rheinkraftwerkes Kembs
Zindel, G. (author)
1930
3 pages
20 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Large scale construction managements -- Construction of Kembs hydroelectric power plant of the rhine
Engineering Index Backfile | 1931
|Rhein River hydroelectric development at Kembs
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1930
|