A platform for research: civil engineering, architecture and urbanism
Construction of earth fill 6.5 km. long and 20 m. maximum height; inclined impervious layer located in upstream half of filled section; slopes vary from 1 on 2 to 1 on 4, crown width is 5 m.; features of equipment for transportation and deposition of earth; rolling of earth is done by track-laying tractors pulling trains of rollers.
Construction of earth fill 6.5 km. long and 20 m. maximum height; inclined impervious layer located in upstream half of filled section; slopes vary from 1 on 2 to 1 on 4, crown width is 5 m.; features of equipment for transportation and deposition of earth; rolling of earth is done by track-laying tractors pulling trains of rollers.
Construction of ottmachau reservoir
Vom Bau des Staubeckens bei Ottmachau
Mueller-Bader (author)
Bautechnik ; 8
1930
4 pages
13 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Service reservoir construction
Engineering Index Backfile | 1914
|Diesels in reservoir construction
Engineering Index Backfile | 1953
|Construction of reservoir walls
Engineering Index Backfile | 1887
|Prestressed concrete reservoir construction
Engineering Index Backfile | 1954
|